My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-25_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2011-01-25_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:24 PM
Creation date
1/31/2011 1:31:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REVISION
Doc Date
1/25/2011
Doc Name
Midterm Review Findings & Cost Estimate
From
DRMS
To
Savage & Savage Environmental
Type & Sequence
MT4
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 007 State : Colorado Permit/job# : C-92-080 <br />Date : 0912412010 County : La Plata Abbreviation :none <br />User : TAK Site: Carbon Junction Mine Filename :C080-007 <br />Adjusted unit production <br />Adjusted fleet production <br />Agency or organization name : CDRMS <br />Permit or other job action : Midterm Review 4 <br />Task description : Spread and grade topsoil for rill (&reveg.) on North Pit <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source: (CRG) <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.84 NA <br />Operating cost/hour : $119.93 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $226.31 Total fleet cost/hour : $226.31 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 54,286 LCY factor : NA volume : 54,286 LCY <br />Source of estimated volume : Swelled volume from Task 006 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Fa( <br />Operator skill <br />Average push distance : 140 feet Material consistency <br />Unadjusted hourly production : 968.5 LCY/hr Dozing method <br />Visibility <br />Material consistency description : Job efficiency <br />Loose stockpile Spoil Pile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Dry packed <br />30.00 % (pos) <br />7,000 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $1.455 /LCY <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />tors <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.30 <br />1.00 <br />0.90 <br />1.00 <br />0.16 <br />155.55 <br />155.55 <br />Total job time : 348.99 <br />Total job cost : $78,981 <br />Source <br />(a vg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd-rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U) <br />LCY/hr <br />LCY/hr <br />Hours
The URL can be used to link to this page
Your browser does not support the video tag.