Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: CDRMS <br />Task #: 006 State : Colorado Permit/job #: C-92-080 <br />Date : 0912912010 County :La Plata Abbreviation :none <br />User: TAK Site : Carbon Junction Mine Filename : C080-006 <br />Permit or otherjob action :Midterm Review 4 <br />Task description :Haul topsoil (mainly for fill) f/ topsoil pile #2 to North Pit <br />HOURLY EQUIPMENT COST <br /> Shift basis : 1 per day <br />( Equipment Description <br />Scraper work team -Scraper :Cat 657E w/push-pull <br />-Push dozer:NA <br />Cost Bre <br />Support equipment -Load area :AAA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $113.35 NA NA NA NA NA <br />Operating cost/hour : $191.41 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.98 NA NA NA NA NA <br />Unit subtotals : $329.75 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $659.49 Support: $0.00 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Total work team cost/hour <br />Initial Swell <br />volume : 38,000 BCY factor : 1.429 <br />Source of quantity take-off : Cost estimate in TR-12 <br />Source of estimated swell factor : NA <br />$659.49 <br />Loose <br />volume : 54,286 LCY