CIRCES Cost Estimatinci Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task # : 004 State : Colorado Permit/job #: C-92-080 <br />Date : 0912912010 County :La Plata Abbreviation :none <br />User : TAK Site : Carbon Junction Mine Filename : C080-004 <br />Permit or other job action :Midterm Review 4 <br />Task description : Haul boxcut spoil fill f/PRSA to N. Pit (see Task 6 for most of N. Pit's fill) <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br /> Equipment Description <br />Truck/loader team -Truck l Generic 12-18 cy, 6x4 <br />-Loader : CAT 98OG (2001) <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 2,500 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA grader misctruk <br />% Utilization-machine : 100 92 NA NA 20 20 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $16.03 $41.36 NA NA $41.68 $8.32 <br />Operating cost/hour : $41.48 $46.06 NA NA $9.25 $2.78 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $22.29 $38.72 NA NA $24.50 $38.70 <br />Unit subtotals : $79.79 $126.14 NA NA $75.43 $49.79 <br />Number of units : 3 1 0 0 1 1 <br />Group subtotals : Work : $365.51 Support : $0.00 Maintenance : $125.23 <br /> Total work team cost/hour : $490.73 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 28,008 BCY factor : 1.330 volume : 37,251 LCY <br />Source of quantity take-off :Permit page 5-30 <br />Source of estimated swell factor : DRMS estimate <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : 18.00 LCY <br />Rated payload : 50,300 pounds Average volume : 15.00 LCY <br />Payload capacity : 17.34 LCY Adjusted volume": 17.34 LCY <br />Final truck volume based on number of loader passes : 14.18 LCY <br />truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 7,000 <br />Rated capacity (nom. heaped) : 7.000 LCY Truck Loader Source <br />Descr.: Blasted rock - poorly blasted (60 - 75%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.675 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 4.725 LCY Net correction : 0.830 0.830