Laserfiche WebLink
-4- <br />12. Prima future!LPost-Mininal land use check one : <br />Cropland(CR) _0 Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industriat/Commercial(IC) <br />Solid Waste Disposal(WD) <br />13. Primarv present land use (check one): <br />0 Cropland(CR) Pastureland(PL) <br />FX I Rangeland(RL;I Forestry(FR) <br />R Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />L.J Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): Gravel will be removed using a <br />Rubber tired loader & excavator. Gravel will be crushed & screened <br />stockpiled and sold. <br />15. On Site Processing: I-XI Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Crushing will be done using a jaw, cone <br />& impact units. Vibrating screens will be used along with conveyor <br />belts to segregate sized materials in various stockpiles. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: No chemicals <br />will be used in. this mining and crushing operation. <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Pit 1 is permitted under a 110 permit ( M-2005-65. Pits 2, 3, & 4 <br />are permitted under a 111 permit ( M-2010-31). The Clarks wish to <br />convert the 110 and 111 to a 112 permit covering 16.3 acres. <br />Q Prati nng at tha 11Q = Prmi f . will or-cur a - , grant Pd in the 1 1 n = Prmi t <br />Operations at the 111 permit will occur as described in the 111 permit <br />apps ; eati .," 1Z1 3-?4?- -r - I wJ 33 be mined as pit 2 n4r4-°r- <br />pit 2 is completed. The pit 3 & 4 sites will be used as stockpile <br />operations will. occur at thelll pit 2 site until pit 2 is complete. <br />At that time crushing and stockpiling operations will be moved to <br />pit 3 and 4 locations. <br />Reclamation at Pit 1 will remain as described in the 110 permit. <br />Reclamation at Pit 2, 3, & 4 will be as described in the ill permit <br />but will be more detailed. <br />