My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-25_REVISION - M2005065 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005065
>
2011-01-25_REVISION - M2005065 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:06 PM
Creation date
1/31/2011 11:06:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
REVISION
Doc Date
1/25/2011
Doc Name
Coversion application (CN-01)
From
Upper Animas Sand & Gravel
To
DRMS
Type & Sequence
CN1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D - MINING PLAN <br />Jack Clark Jr <br />Upper Animas Sand & Gravel - January 2011 <br />This Mining Plan will consist of removing gravel from the various pits using <br />a rubber tired loader, an excavator, a dragline, a bulldozer, and a 10-wheeled <br />dump truck. Pits 1 and 2 will be mined simultaneously. Pit 1 has been mined to a <br />depth of 6 feet, which is just above (approximately 2 feet) the ground water level. <br />Mining in this pit will start on both the south end and north end using an <br />excavator and/or a dragline and rubber tired loader, and will progress towards <br />the center. Gravel will be transported from the excavation site using a rubber <br />tired loader and a 10-wheeled dump truck to the area in the middle of the permit <br />area near the access road. The gravel will be stockpiled and allowed to dry. <br />Eventually the gravel will be transported to the processing area in Pit 2. <br />Gravel will be excavated from Pit 2 using an excavator, dragline or rubber <br />tired loader. This material will be transported to the processing area. The area <br />where Pit 3 and Pit 4 are located will be used as stockpile and batching areas until <br />Pit 1 and Pit 2 are completely mined out. Pit 1 will be mined 12 to 15 feet deep. <br />Pit 2 will be mined 35 to 40 feet deep. Ground water is not expected to be <br />encountered in Pits 2, 3 and 4. Mining will occur 2 feet above ground water <br />elevation. All slopes will be mined at a 3 to 1 slope. <br />All topsoil and fines have been removed and stockpiled during previous <br />mining activities. <br />The processing area will remain on the southeastern portion of Pit 2 until <br />the available mining area is completed. Then the processing area will be moved <br />to the Pit 3 and Pit 4 areas to complete Pit 2 excavation. Pit 3 and Pit 4 will be <br />mined if needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.