Laserfiche WebLink
Water Information <br />BLM Pit -West of Maybell <br />A. No water use is anticipated onsite. <br />B. A stormwater management <br />C. A minor amount of water is anticipated onsite from precipitation. A soil berm will be placed at <br />the upper portion of the perimeter to detour any flows on site. All onsite precipitation will <br />diverted offsite via existing drainage paths. <br />D. Excavated material will either be hauled directly to a project or to the plant and stockpile site for <br />crushing. The plant and stockpile site will either be in the existing pit area or in the proposed <br />addition to the pit. The location of stockpiles will vary as the mining operation progresses over <br />the years. <br />E. The Colorado Department of Transportation or their contractor may use the equipment that <br />they think is best suited to work the pit. <br />F. The backslopes of the pit will be left no steeper than 3:1. The pit floor will be left in a smooth <br />condition and graded to drain into natural drainage areas. <br />G. The haul road to the pit is to remain in place when work in the pit is completed. <br />H. The approximate depth of the pit will be 15 feet. <br />1. The seed and seeding rate as shown in the reclamation plan will be used on stockpiled soil <br />overburden.