Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />F]Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />-0 Developed Water Resources(WR) <br />13 <br />Cropland(Ck) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br /> General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Anticipated equipment will consist of Front End Loaders and Excavators but will dependent on the contractor. <br />15. On Site Processing: IZ Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavated material will be crushed, if necessary, sorted and stockpiled. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />An increase of area from 24.62 acres to 39.50 acres which is a total increase of 14.88 acres <br />