Laserfiche WebLink
' 2010 Annual Reclamation Report <br />Edna Mine <br />Permit C-80-001 <br />Table 3. Topsoiled Acreage Summary <br />' <br />I Total Cumulative Total 1 <br /> Stockpiled 273.5 245.4 <br />' Live Handled, Roto-Cleared 215.0 215.0 <br /> Live Handled, Non-Roto-Cleared 61.60 61.60 <br />Totals 550.1 522.0 <br />Table 3 summarizes all Topsoiled Acreage at the Edna Mine. The Topsoiled Areas are <br />illustrated on Exhibit 2; Topsoiled and Seeded Summary. <br />Notes: <br />1. Excludes acres where Phase III has been achieved. Bond Release Number SL-5 has <br />reached Bond Phase M. This decreased the Stockpiled Cumulative Total by 26.1 acres, <br />the Physical Descriptions Portion of Center Ridge and South of Shop were Stockpiled. <br />Bond Release Number SL-8 has reached Bond Phase III. This decreased the Stockpiled <br />Cumulative Total by 2.0 acres. Only a portion of Bond Release Number SL-8 was <br />Stockpiled. <br />?,. <br />? W WI.ENGINEERING Page 5 of 8