Laserfiche WebLink
20 10 Annual Reclamation Report <br />Edna Mine <br />Permit C-80-001 <br />RECLAIlVIED LAND ACREAGE SUNUgARY <br />The following tables provide a recap of the final disposition of all lands bonded, disturbed and <br />undisturbed, at the Edna Mine under the permanent program regulations. <br />Table 1. Bond Release Summary <br />Bond Bond Bond Bond Physical Bond <br />Release Bond <br />Ph Phase I Phase II Phase III Physical Description Release <br />Number ase Acreage Acrea e Acreage Description Acreage Acreage <br />SL-1 III 4.0 4.0 4.0 Portion of Center 4.0 T4.0 <br />Ridge <br />Portion of Center <br />SL-2 I 15.6 Ride 15.6 597.1 <br />581.5 West Ridge 581.5 <br />SL-4 I 342.5 Moffat Area 342.5 342.5 <br /> 37.5 37.5 37.5 East Ridge 37.5 <br />SL-5 III 15.6 15.6 15.6 Portion of Center 15.6 63 <br />6 <br /> Ridge . <br /> 10.5 10.5 10.5 South of Shop 10.5 <br />I III 13.5 13.5 13.5 I Upper Shop 13.5 I 13.5 <br />SL-6 <br />Facilities Area <br />SL-7 I 258.0 Support Facilities 258.0 258.0 <br />Conveyer Belt, <br />SL-8 III 10.0 10.0 10.0 Goat Trail, Lower 10.0 10.0 <br />Facilities <br /> Gravel Pad, <br />SL-9 III 3.3 3.3 3.3 Entrance Gate and 3.3 3 <br />3 <br /> Roads, Oak Creek . <br /> Facilities <br />SL-10 III 13.3 13.3 13.3 Old Tipple Road, 13.3 13.3 <br />Facilities, Ponds <br />Totals 1305.3 107.7 107.7 1305.3 1305.3 <br />Table 1 summarizes all Bond Release Numbers, Phases, Physical Descriptions, and Acreages. <br />The Bond Release. Areas are illustrated on Exhibit 1; Bond Release Summary. <br />" YVMCENGINEERING Page 3 of 8