Laserfiche WebLink
l ?,1 <br />12. PrimarL fatam ftjL-mining) land use one <br />Cropland(M) Pasturdand(PL) <br />RmWland(RL) Forestry(FR) <br />Residatial(RS) Recreation(RC) <br />Developed Water Resom=KWR) <br />13. <br />Cropland(CR) Pathaeland(PL) <br />Rangeland(RL.) Forestry(FR) <br />Reside ndal(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />0 <br />-4- <br />General Agriculture(GA) <br />Wildlife HW*A(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />II Industrial/Commercial(IC) <br />14. Method of Mmine : Briefly explain mining method (e.g. truck/shovel}. Gravel will he removed using a <br />Rubber tired loader & excavator. Gravel will be crushed & screened <br />stockpiled and sold. <br />15. On Site ProcesiN r X1 CrushfiWScreeaing <br />13.1 Brieflyexplainminingmethod (eg.truck/shovel): Crushing, will be done using a jaw, cone <br />& impact units. Vibrating screens will be used along with conveyor <br />belts to segregate sized materials in various stockpiles. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: No chemicals <br />will be used in this mining and crushing operation. <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief'nanative describing the proposed grange(s). <br />Pit 1 is permitted under a 110 permit ( M-2005-65. Pits 2, 3, & 4 <br />are permitted under a 111 permit ( M-2010-31). The Clarks wish to <br />convert the 110 and 111 to a 112 permit covering 16.3 acres. <br />n=,jarat i nnS at t>7p 1 1 npermit will nt-eia1- as grani-sad in the 11t) = Prmi t _ <br />operations at the 111 permit will occur as described in the 111 permit <br />appileat-l a- : Pit -2 ad- 4-use as* 2-d- will h-8 Mi?6d1 ag pit 2 - <br />19t-+e--pit 2 is completed. The pit 3 & 4 sites will be used as stockpile <br />operations will occur at theill pit 2 site until pit 2 is complete. <br />At that time crushing and stockpiling operations will be moved to <br />pit 3 and 4 locations. <br />Reclamation at Pit 1 will remain as described in the 110 permit. <br />Reclamation at Pit 2, 3, & 4 will be as described in the 111 permit <br />but will be more detailed.