Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use check one : <br />Cropland(CR) H Pastureland(PL) <br />Rangeland(RL) -E]Forestry(FR) <br />Residential(RS) F? Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary present land use (check one): <br />12 Cropland(CR) ?U Pastureland(PL) <br />Rangeland(RL) LJ Forestry(FR) <br />Residential(RS) FIRecreation(RC) <br />Developed Water Resources(WR) <br />14 <br />FIGeneral Agriculture(GA) <br />Wildlife Habitat(WL) <br />_ Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />II Industrial/Commercial (IC) <br />Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Materials will be mined using front end loaders, trucks and scrapers. <br />15. On Site Processing: 1-1 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material will be excavated with a front-end loader and conveyed to the 35th Avenue Mine plant site to be processed. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />See attached Chemical Inventory. <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s).