Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />Permittee/ Permit Field Visit State Program <br />Person WESTERN FUELS - COLORADO Number C- 008 -81 Date 01/19/2011 Continuation Page <br />29. Off -Site Implact Data and Identified Violation Data. <br />People Land Water Structures <br />Blasting ❑ <br />List all Ten -Day Notice actions and all Federal NOV or CO actions taken or reviewed during <br />this current OSM site <br />visit. <br />List the <br />C. Performance Standard <br />off -site impacts associated with either State or Federal actions taken during this site visit. <br />D. Abated (Y/N) <br />N❑ <br />Stability F] <br />11 <br />9 A. Specific State Law/Regulations Violated: 34- 33-102 <br />❑ <br />L. Off -Site Impacts <br />2❑ <br />B. Description Complainant alleges PR -6 does not protect the landowner or his property y d takes <br />People Land <br />Water Structures <br />away land owner plans and permissions. ( 49) <br />Blasting <br />❑ <br />❑ <br />❑ <br />❑ <br />C. Performance Standard <br />AN <br />D. Abated (Y/N) N❑ <br />Stability ❑ <br />❑ <br />❑ <br />❑ <br />E. OSM Action 2❑ F. OSM Action Number <br />Xll- 140 -182 -002 <br />Viol.# <br />09 <br />Hydrology <br />Other ❑ <br />❑ <br />❑ <br />G. Optional <br />F <br />H. Any Off -site Impacts Y/N <br />L. Off -Site Impacts <br />Encroachment ❑ <br />❑ <br />❑ <br />❑ <br />L Latitude <br />038° 16' 07" <br />J. Longitude 080 33' 19" K. Elevation <br />Other ❑ <br />❑ <br />❑ <br />❑ <br />10 A. Specific State Law/Regulations Violated: 4.16.1 <br />❑ <br />L. Off -Site Impacts <br />AN <br />B. Description Complainant alleges PR -06 does not put property back as good or better. ( #10) <br />People Land Water Structures <br />Blasting ❑ <br />❑ <br />❑ <br />❑ <br />C. Performance Standard <br />AN <br />D. Abated (Y/N) <br />N❑ <br />Stability F] <br />11 <br />11 <br />❑ <br />E. OSM Action <br />2❑ <br />F. OSM Action Number <br />Xll -140- 182 -002 <br />Viol.# 10 <br />Hydrology ❑ <br />❑ <br />❑ <br />G. Optional <br />F <br />H. Any Off -site Impacts Y/N <br />Encroachment ❑ <br />❑ <br />❑ <br />1. Latitude 0380 <br />16' 07" <br />J. Longitude 11 080 33' 19" K. Elevation <br />Other ❑ <br />❑ <br />❑ <br />❑ <br />11 A. Specific State Law /Regulations Violated: 2.04.12(1) <br />L. Off -Site Impacts <br />Complainant alleges a rime farmland investigation was never conducted and this is <br />B. Description p s p <br />People Land Water <br />Structures <br />documented in PR -06 as well as by the Division itself. ( 411) <br />Blasting <br />❑ <br />❑ <br />❑ <br />❑ <br />C. Performance Standard <br />AN <br />D. Abated (Y/N) <br />N❑ <br />Stability ❑ <br />❑ <br />❑ <br />❑ <br />E. OSM Action <br />2❑ <br />F. OSM Action Number <br />X11 -140- 182 -002 <br />Viol.# 11 <br />Hydrology <br />❑ <br />G. Optional <br />F <br />H. Any Off-site Impacts Y/N <br />Encroachment <br />❑ <br />❑ <br />❑ <br />I. Latitude 038016' 07" J. Longitude 080 33' 19" K. Elevation <br />Other ❑ <br />❑ <br />❑ <br />12 A. Specific State Law/Regulations Violated: 2.0602) <br />L. Off -Site Impacts <br />B. Description Complainant alleges the Division used the Colorado Prime Farmland Inventory rather <br />People Land Water <br />Structures <br />than the National Soil Survev Handbook. 012) <br />Blasting ❑ <br />❑ <br />❑ <br />❑ <br />C. Performance Standard <br />AN <br />D. Abated (Y/N) <br />N❑. <br />Stability ❑ <br />❑ <br />❑ <br />❑ <br />E. OSM Action 2❑ F. OSM Action Number I <br />Xll -140- 182 -002 <br />Viol.# <br />12 <br />Hydrology <br />G. Optional <br />F <br />H. Any Off site Impacts Y/N <br />Encroachment <br />❑ <br />I. Latitude 038016' <br />07" <br />J. Longitude 11 <br />080 33' 19" <br />K. Elevation <br />Other <br />❑ <br />❑ <br />❑ <br />❑ <br />OSM Action Off -Site Impacts <br />1) Deferred to State Action 6) ID -CO Issued (Imminent Danger to Public) For each type of impact and resource affected; enter <br />2) TDN Issued 7) Previously Cited by RA, Abatement Pending "N, D, or J" to describe the degree of off -site impact: <br />3) NOV Issued 8) Abated during or before OSM Inspection N - Minor Occurrence <br />4) FTA -CO Issued 9) Follow -up of Federal Action Page —15 of —(L <br />5) IH -CO Issued (Imminent Environmental Harm) 0) Off -Site Impact with no violation D - Moderate Occurrence <br />r_ AA.i..r(l­­....o Revised October 1. 2010 <br />■ <br />