Laserfiche WebLink
<br /> <br />Top of dam <br />No overburden will be stripped due the material is <br />silty deposited into an existing pond and is only a <br />clean out of a pond, <br />6" of Top soil on average to be spread out <br />over the area of the stockpile area and <br />topsoil area. Ground to be ripped or <br />scarified to prep before seeding. No seed <br />will be needed within the pond area. Any . <br />other ground within the permit boundary <br />that was compacted or vegetation <br />destroyed will be scarified and seeded in <br />the same manner as the stockpile area, <br />other than the inside of the pond. No <br />shrubs or trees will be planted. <br />f <br />Plan View of Lost Cause Reclamation Plan <br />(Not to Scale) <br />2:1 slope on the inside of dam face <br />to the bottom of the pond. <br />3:1 slopes from the edge of the pond also known a <br />the shore line. <br />Permit boundary <br />*TWs map is to used in con*ction NNith the <br />Lost Cause Mine Plan map shoring section line<. <br />and legal descriptions.