Laserfiche WebLink
-4- <br />12. Primar future (Post-mining) land use check one : <br />0 Cropland(CR) -0 Pastureland(PL) <br />MT Rangeland(RL) ? Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />El General Agriculture(GA) <br />J Wildlife Habitat(WL) <br /> Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />13. Primary resent land use check one : <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) LJ Wildlife Habitat(WL) <br />B Residential(RS) Recreation(RC) 0 Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Anticipated equipment will consist of Front End Loaders and Excavators but will dependent on the contractor. <br />15. On Site Processing: 7 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavated material will be crushed, if necessary, sorted and stockpiled. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />An increase of area from 24.62 acres to 39.50 acres which is a total increase of 14.88 acres. <br />I IIIIII VIII VIII VIII VIII III II VIII VIII III I IIII <br />20110520 1/19/2011 3:09 PM Lila Herod <br />4 of 8 MI R$46.00 D$0.00 Moffat County Clerk