Laserfiche WebLink
JAN 4U11 <br />L Division oY Raclam2bon, <br />?+'• Minindat Saf <br />?rado Division of Reclamation, Mining ano ty <br />M+ci+n9 ago ? <br />Annual Reclamation Report for the Year 2010 <br />Bear No. 3 Mine <br />C-1981-033 <br />permit # <br />mine name <br />• <br />Address: 1326 War Emblem Lane, Rock Springs, WY, 82901 <br />Bear Coal Company, Inc. <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 9.8 + -0- 9.8 <br />Acres backfilled and graded 8.0 + -0- 8.0 <br />Acres to soiled 4.4 + -0- _ 4.4 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateaorv helow no not inrhlrla arras that haves mrhicvari finni Phnen III rclnncn <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded" 8.0 + -0- = 8.0 = 0.0 + 8.0 <br />uiauue, n necessary, a uescnptlon of any augmentea seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 9.8 and the total number of acres: <br />Phase I released -0- Phase II released -0- Phase III released -0- <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 1.8 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z 1.8 <br />Acreage in active mining areas 3 -0- <br />1 (exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />• graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />4.