My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08_PERMIT FILE - C1981008A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2010-12-08_PERMIT FILE - C1981008A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:43 PM
Creation date
1/21/2011 5:17:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2010
Doc Name
SOIL RESOURCE INFORMATION
Section_Exhibit Name
Section 2.04.9 Soil Resource Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to ensure that this subsoil meets the criteria for prime farmland. This data is discussed in Section <br />2.05.4(2)(d) Topsoil Redistribution and Attachment 2.05.4(2)(d) -1. <br />Available topsoil that has not been stripped as of February 2008 was determined. These soils were <br />characterized during the Order 1 Soil Survey (IRI, 1998). Table 2.04.9 -8C shows a summary of <br />the results from those soil pits from the 1998 survey that are in unstripped soil as of February 2008. <br />The topsoil and subsoil salvage calculations for the area west of 2700 Road are given below in <br />Table 2.04.9 -9. This Table includes all areas that have been topsoiled west of 2700 Road, all <br />stockpile inventories and all topsoil and subsoil available from undisturbed areas. It is estimated <br />that for non prime soils, 80% of the thickness value from the 1998 survey will be salvaged for Lift <br />A and Lift B and combined together as a Mixed Topsoil. It is estimated that for prime soils, 93% <br />of the thickness value from the 1998 survey will be salvaged for Lift A and Lift B. It is demonstrated <br />in Section 2.05.4(2)(d) Topsoil Redistribution that the soil volumes available are adequate for the <br />reclamation in all current and future disturbed areas. <br />Revised September 2010 (PR 06) 2.04.9 -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.