Laserfiche WebLink
Section 2.05.3(3) <br />Mine Facilities <br />1. Introduction <br />This section contains a description of the proposed structures to be used in connection with or <br />to facilitate the surface coal mining and reclamation activities at the New Horizon 2 mine area <br />described in Section 2.05.3, Operation Plan: Permit Area. <br />Facilities approved for construction at the New Horizon 2 mine area by previous permitversions <br />and the current version are described in the following sections. Some of the facilities have not <br />yet been built. Construction of these will occur on an as needed basis consistent with the permit <br />requirements. <br />2. Sediment and Water Control Facilities Plan <br />Western Fuels- Colorado will use various types of structures to control the runoff from disturbed <br />areas within the permit boundaries at the New Horizon Mine. In addition, surface mining <br />activities will be planned and conducted to minimize disturbance of the prevailing hydrologic <br />balance in both the mine plan and adjacent areas in order to prevent long -term adverse changes <br />in the hydrologic balance. <br />Sediment control measures will include proper utilization of mining and reclamation methods and <br />sediment control practices singly or in combination. Sediment control methods may include, but <br />not be limited to the following: <br />1. Disturbing the smallest practicable area at any one time during the mining and <br />construction operation; <br />2. Stabilizing graded material to promote a reduction in the rate and volume of <br />runoff; <br />3. Retaining sediment within disturbed areas; <br />4. Diverting runoff away from disturbed areas including stockpiles, back slopes, and <br />material storage; <br />Revised June 2010 (PR06) 2.05.3(3) -1 <br />