My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08_PERMIT FILE - C1981008A (13)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2010-12-08_PERMIT FILE - C1981008A (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:43 PM
Creation date
1/21/2011 5:11:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2010
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Pave 27 Road and BB Road in original locations and restore Sunshine <br />Pending, <br />Ranch Corner intersection. <br />(waiting for a <br />contractor to <br />mobilize into <br />the area) <br />9 <br />Remove BB Road detour and reclaim road area <br />2009 <br />10 <br />Mine west to last cut at western permit boundary <br />2013 <br />11 <br />Backfill final cut with overburden stockpile <br />2013 -2014 <br />12 <br />Retopsoil and revegetate final cut area <br />2014 <br />13 <br />IReplace BB Road from Sunshine Ranch Corner to western boundary. <br />2014 <br />14 <br />Continue to irrigate and monitor reclaimed areas until final bond <br />2014 -Bond <br />release. <br />Release <br />As of the Permit Revision 06, the Sunshine ranch intersection has been restored but not yet <br />paved. The BB Road Detour will be reclaimed by the end of 2009, except for the portion on <br />the Benson east property, which will remain at the request of the landowner. A letter from <br />the landowner certifying his desire for the road to remain can be found in Attachment <br />2.05.3(3) -8. <br />11. Support Facilities <br />Buildings. Existing buildings include a cinder block building (16'x 32') to be used as a <br />conference and training facility, a metal shop building (33'x 46) to be used as a warehouse, <br />a cinder block storage building (25'x 90') also to be used for warehousing, a foreman's <br />trailer (10'w x 371 x 8'h), a parts semi -truck trailer (8'w x 401 x 8'h), a pre- engineered metal - <br />frame -metal clad repair shop (52'x 86) with outside equipment wash pad, an oil separator <br />that is attached to the wash pad to separate oil from the wash water, a 10'x10' furnace room <br />attached to the north end of the repair shop, a metal- frame -metal clad bath house 24' x 34'), <br />and a fuel and tube oil storage and pump facility consisting of storage vessels contained <br />inside a lined earthen berm that will contain the volume from the largest vessel plus the 10yr- <br />24hr rainfall event, and a frame house (24'x 40') in use as the mine office all located at the <br />New Horizon 2 facilities area. Map 2.05.3 -1 shows the locations of the existing buildings. <br />Details of sizes and types of construction for all buildings are shown in the following table. <br />Revised June 2010 (PR06) 2.05.3(3) -41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.