My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08_PERMIT FILE - C1981008A (13)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2010-12-08_PERMIT FILE - C1981008A (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:43 PM
Creation date
1/21/2011 5:11:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2010
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Access Roads <br />Under the definition of Access Roads provided in Section 1.04 of the Rules, there are no <br />access roads on the site. There are 3 Haul Roads and one Light Use Road in the permit <br />area. The 5 Street Road is a light use road since mine personnel do not use the road every <br />day. <br />Light -Use Roads <br />At the New Horizon Mine, light -use roads will only be used on an intermittent basis for <br />purposes other than transportation of coal including, but not limited to, roads used for <br />monitoring and periodic maintenance of monitoring facilities and reclamation areas, <br />intermittent equipment passage from one mine area to another mine area, or other <br />occasional use. The only road that meets this criteria at the mine site is the 5 Street Road. <br />This road is occasionally used to monitor wells, Pond 007 and the mine discharge into <br />Calamity Draw. <br />In the New Horizon 2 area, there is a single lane dirt road approximately 0.57 miles long <br />which extends to the west of 5th Street Light Use Road (see Map 2.05.3(3) -8). This road is <br />used by the City of Nucla for access to the city sewage lagoon and to one residence. <br />Alternative access has been provided as required by the Montrose County Commissioners. <br />The Montrose County Commissioners granted Peabody (and by succession, WFC) <br />permission to temporarily close this road during mining (see Attachment 2.05.3(3) -8, County <br />Agreement). WFC will reopen the road to meet or exceed the terms of the Montrose County <br />Road Closure Agreement. <br />All criteria listed below are utilized in the construction of the 5 Street Road. <br />General Requirements WFC will construct, maintain and reclaim light -use roads to <br />minimize erosion and siltation, air and water pollution and damage to public and private <br />property. To the extent possible, using the best technology currently available, light -use <br />roads will not cause damage to fish, wildlife, or related environmental values and will not <br />cause additional contributions of suspended solids to stream flow or to runoff outside the <br />Revised June 2010 (PR06) 2.05.3(3) -33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.