Laserfiche WebLink
This Bench 1 material will be obtained from the mining of the last 3 mining cuts on the WFC <br />property. <br />The adjacent 1.13 acres will have undisturbed prime farmland soil (once Stockpile #4 is removed). <br />This area will require disking and replanting for rejuvenation. <br />No additional stripping in the area of the 98A soil is planned for the remainder of the life of the mine. <br />No more excavation will occur in the pond area, therefore, if this material is replaced in the area it <br />was removed, the prime farmland soil handling requirements will have been met. The two stockpiles <br />will need to be moved prior to reclamation of Pond 13. The piles will be moved to the backfilled area <br />of the pit near the pond, as mining approaches. The soil will not be mixed with any other soil from <br />the mining area. <br />Revised September 2010 (PR 06) 2.05.4(2)(d) -35 <br />