Laserfiche WebLink
The total affected area is roughly 768 acres. The volume of the reclaim spoil to be recharged below <br />the 5580 spoil spring elevation equals 2,778 ac.ft. as determined from D.T.M. modeling of the spoil <br />area and the pit bottom. Spoil porosity of 15% is determined for the overburden. This yields a pore <br />volume of (0.15)(2778 ac.ft.) = 416 ac.ft. <br />Worst Case Discharge <br />With a pore volume of 416 ac.ft. and assuming a total recharge of 16" per year from all sources <br />over the 768 acres of spoil, annual recharge equals (16/12)(768) = 1024 ac.ft. per year after full <br />irrigation in 2013. It should be noted that a portion of the reclaimed area will be restored to dry land <br />pasture and will therefore will not contribute irrigation recharge, however, other areas will have a <br />greater recharge than 16" total, therefore, the average of 16" over the reclaimed area is <br />reasonable. From the year 2003 to 2013, the expected recharge should only be 10% of this <br />amount, since irrigation will not be used on the majority of the area and the fresh - placed spoil will <br />be relatively dry. <br />Spoil spring discharge = (Spoil Spring Recharge) — (Seepage into tow Wall) <br />Seepage into Low Wall = (10 ft. thick permeable sandstone bed in lowwall)(8500 ft. wide seepage <br />area)(0.10 ft. per day seepage velocity)(1 /43,560 cu. ft. to ac. ft.)(365 days per year) = 72 ac.ft. <br />Spoil Spring Discharge = (1024 ac.ft. recharge) — (72 ac.ft. seepage into low wall) = 952 ac.ft. In <br />the year 2000, the NPDES 001 discharge at the New Horizon #1 Mine showed an average flow of <br />271,000 gallons per day or 320 acre -feet per year. The NPDES 001 discharge is for practical <br />purposes composed entirely of spoil water. The New Horizon #2 spoil area is much bigger, <br />therefore the predicted flow of 1024 acre -feet per year for this area is a reasonable maximum flow <br />when compared to what is being observed at the #1 Mine. <br />Worst case time to spring discharge = (Pore Volume) /(Recharge Volume) <br />= (416 ac.ft.) / (952 ac.ft.) = 0.4 years to actual spring flow after full irrigation is resumed on the <br />reclaimed land in 2013. This is in the worst case scenario with the maximum amount of spoil <br />exposed to irrigation water. <br />Revised August 2010 (PR06) 2.05.6(3) -23 <br />