The pond volume below the primary spillway will be comprised of one design need: <br />• 1) 3 year sediment delivery of 0.2 acre -ft, as based on the calculations above. <br />As seen in the stage storage relationship, the pond has 3.7 acre -ft of storage at (5555') the <br />primary spillway. Detention time of 24 hours is shown in the SEDCAD outputs, which are at the <br />end of this section. <br />The pre mine volume required to be stored is 2.1 acre -ft. The post mine volume that must be <br />stored in Pond 013 is 4.9 acre -ft. The post mine conditions are the worst case, and therefore <br />are used to determine if Pond 013 is sufficient. As shown by the SEDCAD calculations, Pond <br />013 has 9.9 acre -ft of capacity at the emergency spillway, and will be able to hold the worst <br />case (post mine) conditions. <br />• <br />• <br />Revised May 2010 (PR06) Attachment 2.05.3(3) -6 -8 <br />