My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08_PERMIT FILE - C1981008A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2010-12-08_PERMIT FILE - C1981008A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:43 PM
Creation date
1/21/2011 3:46:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2010
Doc Name
Pond 011 Engineering and Hydrologic Design
Section_Exhibit Name
Section 2.05.3(3) Attachment 2.05.3(3)-22
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Post Mine Drainage <br />• 166.1 acre drainage area <br />• During mining, the maximum pit pumping rate will be 600 gpm from the active mine pit <br />pump system into Pond 11. <br />• Pit pump water will need a retention time of approximate 1 day so the PH of the water <br />will stabilize and pass the WET toxicity test. <br />• Therefore, add: [(600gpm x 60mph x 24hpd x 1 days)/7.5 gal per cu- ft] /43560sq -ft per <br />ac =2.6 ac -ft <br />Runoff Curve Number and Runoff (SurvCAD) <br />Project: Pond 011 <br />Location: New Horizon #2 <br />Developed <br />By: B Langenfeld Date: 09/01/09 <br />Checked: Date: <br />1. Runoff Curve Number (CN) <br />Cover description CN <br />Mined Land, Disturbed (Poor) 87 <br />Herbaceous mixture (Good) 74 <br />Pasture Grassland Range (Good) 80 <br />CN (weighted): 78.9 <br />Total Area: 166.074 Acre <br />2. Runoff <br />Return Period: <br />10 -Year <br />Rainfall, P: <br />2.00 in <br />Runoff, Q: <br />0.5174 in <br />Runoff Volume: <br />7.1608 Acre -Ft <br />Soil Type Area(Acre) <br />C 14.700 <br />C 48.430 <br />D 102.944 <br />The pond volume below the emergency spillway will be comprised of three design needs: <br />1) 10 year storm inflow of 7.2 acre -ft, as described above <br />2) 3 year sediment delivery of 0.1 acre -ft, as based on the calculations shown below. <br />3) 2.6 acre -ft of pit pump water. <br />Revised February 2010 (PR06) Attachment 2.05.3(3) -22 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.