Laserfiche WebLink
• SEDCAD 4 for Windows <br />DOA _onm i c,K —h <br />9 <br />Dead Space: <br />*No sediment capacity defined <br />Perforated Riser <br />Riser Riser Height ', Barrel Barrel Barrel Slope Spillway Elev Number of <br />Diameter (ft) Diameter Length (ft) ( %) Manning's n (ft) Holes per <br />(in) (in) Elev <br />12.00 10.00 12.00 100.00 1.18 0.0150 5,615.50 1 <br />Straight Pipe <br />Barrel <br />Barrel <br />Entrance <br />Tailwater <br />H'graph Detention Time: <br />Barrel Manning's <br />Spillway <br />Diameter <br />Length <br />Loss <br />Depth <br />Dewater Time: <br />Slope ( %) n <br />Elev (ft) <br />(in) <br />(ft) <br />Coefficient <br />(ft) <br />18.00 <br />40.00 1.00 0.0150 <br />5,616.00 0.50 <br />0.00 <br />Straight Pipe <br />Barrel <br />Barrel <br />Entrance <br />Tailwater <br />H'graph Detention Time: <br />Barrel Manning's <br />Spillway <br />Diameter <br />Length <br />Loss <br />Depth <br />Dewater Time: <br />Slope ( %) n <br />Elev (ft) <br />{in) <br />(ft) <br />Coefficient <br />(ft) <br />18.00 <br />40.00 1.00 0.0150 <br />5,616.00 0.50 <br />0.00 <br />• <br />Straight Pipe <br />Barrel <br />Barrel <br />Entrance <br />Tailwater <br />H'graph Detention Time: <br />Barrel Manning's <br />Spillway <br />Diameter <br />Length <br />Loss <br />Depth <br />Dewater Time: <br />Slope ( %) n <br />Elev (ft) <br />(in} <br />{ft) <br />Coefficient <br />(ft) <br />18.00 <br />40.00 1.00 0.0150 <br />5,616.00 0.50 <br />0.00 <br />Pond Results: <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation - Capacity- Discharge Table <br />Filename: 011 POND 25YR post mine 1day pump 15sept09.sc4 <br />Printed 09 -16 -2009 <br />• Revised February 2010 (PR06) Attachment 2.05.3(3) -22 -31 <br />Peak Elevation: 5,616.57 ft <br />H'graph Detention Time: <br />10.82 hrs <br />Pond Model: <br />CSTRS <br />Dewater Time: <br />3.32 days <br />Trap Efficiency: <br />93.29% <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation - Capacity- Discharge Table <br />Filename: 011 POND 25YR post mine 1day pump 15sept09.sc4 <br />Printed 09 -16 -2009 <br />• Revised February 2010 (PR06) Attachment 2.05.3(3) -22 -31 <br />