My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-19_REVISION - C1981019 (7)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-01-19_REVISION - C1981019 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:09 PM
Creation date
1/20/2011 1:57:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
1/19/2011
Doc Name
Updated 2011 2009 Phase III Bond Release Evaluation - Year 2
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 SamMe Adeauacv Determination <br />Sampling within each managerial unit was conducted to a minimum of 26 ground cover and 40 <br />woody plant density and production samples for the reclamation unit and 30 ground cover and 45 <br />production samples for the reference areas. From these preliminary efforts, sample means and standard <br />deviations for total non-overlapping vegetation ground cover, production, and woody plant density were <br />calculated. For non-monitoring applications, the typical procedure is that sampling must continue until <br />an adequate sample, nmin, has been collected in accordance with the Cochran formula (below) for <br />determining sample adequacy, whereby the population is estimated to within 10% of the true mean (p) <br />with 90% confidence. <br />When the inequality (nmin <_ n) is true, sampling is deemed adequate; and nmin is determined as <br />follows: <br />nmin = (r252) / (0.1 X )2 <br />where: n = the number of actual samples collected (initial size = 26, 30, 40, or 45) <br />t = the value from the one-tailed t distribution for 90% confidence with n-1 <br />degrees of freedom; <br />S 2 = the variance of the estimate as calculated from the initial samples; <br />x = the mean of the estimate as calculated from the initial samples. <br />If the initial samples do not provide a suitable estimate of the mean (i.e., the inequality is false), <br />additional samples would be collected until the inequality (nmin <_ n) becomes true. <br />CEDAR CREEK ASSOCIATES, Inc. Page 8 Colowyo Coal Company <br />2009 Phase III Bond Release Evaluation
The URL can be used to link to this page
Your browser does not support the video tag.