My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-19_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-01-19_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:09 PM
Creation date
1/20/2011 1:57:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
1/19/2011
Doc Name
Response to PAR Adequacy Comments & Responses (Part 1 of 3)
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ,Jennifer Sekulski-Barton <br />ry'? Colowyo Coal Company <br />1 <br />hwa <br />Hi <br />04 3 <br />y <br />g <br />5731 State <br />6 <br /> 41 <br />Meeker, CO 81 <br />*i <br />W* T:6?6-824-1529 <br />rL•. <br />rr - ! <br />Mr. James R. Stalk <br /> Environmental ote?tion specialist <br />- <br /> Division of Reclamation, Mining and Safety <br />Coioracto <br />IAN 1 2011 <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 215 <br />Division wand Safe?N <br /> Denver, CO 80203 Loing <br />January 18, 2010 <br />RE: Response to PAR for Phase III Bond Release on 1978-1999 <br />Reclaimed Areas, Colowyo Coal Company L.P. Permit No. C-1981- <br />019 <br />Dear Mr. Stark, <br />Colowyo has received the Division's preliminary adequacy comments on SL-05 and <br />has the following comments and responses: <br />Division's Comment <br />The data from the BRB 96-99 sampling includes data from reclamation blocks <br />not included in the phase 111 bond release block for both 2008 and 2009. These <br />reclamation blocks include WP003 and WP004. In order for the Division to <br />consider the data for BRB 96-99, sampled in 2008 and 2009, as having achieved <br />reclamation success, the data collected from these two reclamation blocks <br />(WP003 and WP004) will need to be removed from the data set. Data collected <br />from transects 4, 5, 6, 7 and 8 from the 2008 sampling year fell within <br />reclamation blocks not under consideration for Phase 111 Bond Release. Data <br />collected from transects 34, 35, 37 and 38 from the 2009 sampling year fell <br />within reclamation blocks not included in the Phase 111 Bond Release block. <br />Based on Map 2 from the 2009 vegetation report, it is unclear whether transect <br />36 fell within a reclamation block included in the Phase 111 Bond Release block. <br />Please remove the transect data that do not fall within the Phase 111 Bond <br />Release block limits for BRB 96-99. Please recalculate and resubmit the <br />resulting vegetation sampling data for reclamation block BRB 96-99 to the <br />Division for review. <br />Colowyo's Response: <br />The vegetation study reports have been recalculated as a result of the Division's <br />comment. These reports are included with this submittal for the Division's review.
The URL can be used to link to this page
Your browser does not support the video tag.