Laserfiche WebLink
HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 852.6 LCY/hr <br />Material consistency description: <br />Consolidated stockpile <br />Average push gradient: 20 % <br />Average site altitude: 8,600 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: <br />Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.900 (SSD-FC) <br />Push gradient: 0.545 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material weight: 0.902 (CAT HB) <br />Blade type: 1.000 (PAT) <br />Net correction: CNetCorrection <br />Adjusted unit production: 234.81 LCY/hr <br />Adjusted fleet production: 234.81 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.695 /LCY <br />Total job time: 4.15 Hours <br />Total job cost: $676.71 <br />