My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-11_REVISION - M1999042
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999042
>
2011-01-11_REVISION - M1999042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:25 AM
Creation date
1/20/2011 8:57:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999042
IBM Index Class Name
REVISION
Doc Date
1/11/2011
Doc Name
Surety increase notice (SI-02)
From
DRMS
To
Avalanche Creek Marble and Alabaster, LLC
Type & Sequence
SI2
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 852.6 LCY/hr <br />Material consistency description: <br />Consolidated stockpile <br />Average push gradient: 20 % <br />Average site altitude: 8,600 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: <br />Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.900 (SSD-FC) <br />Push gradient: 0.545 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material weight: 0.902 (CAT HB) <br />Blade type: 1.000 (PAT) <br />Net correction: CNetCorrection <br />Adjusted unit production: 234.81 LCY/hr <br />Adjusted fleet production: 234.81 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.695 /LCY <br />Total job time: 4.15 Hours <br />Total job cost: $676.71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.