Laserfiche WebLink
DnAnARI F 1=n111PMFNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 15K GVW $48.51 1 $48.51 $48.51 <br />-Light Duty Pickup, 4x4, 314 T. $30.11 1 $30.11 $30.11 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $78.62 $78.62 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Glenwood Springs <br />Transportation Cycle Time : Non- Total one-way travel distance : 20.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.57 0.57 Total non-roadable mob/demob cost $1,570.83 <br />Return time (hours) = 0.57 0.57 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $89.85 <br />Unloading time (hours) = 0.50 NA *• one round trip, no haul rig <br />Subtotals = 2.14 1.14 <br /> <br />.......:::.:::.::::.:::.....:.............. <br /> <br />.....:....: <br />JOB TIME AND COST :::.. .::.;:.;;;;;>;;: >.... <br />........ <br /> <br />Total job time : <br /> <br /> <br />.29 hours <br /> Total job cost : $1,661