Laserfiche WebLink
CIRCES Cost Estimating Software <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION <br />Task #: 06A State: Colorado <br />Date: 1/11/2011 County: Pitkin <br />User: GRM Site: White Ranks Mine <br />Agency or organization name: DRMS <br />Permit or other job action: 2011 update <br />Task description: Demo and dsiposal of on site structures <br />UNIT COSTS <br />Location adiustment: 93.00 % <br />Structure or Item Demolition Menu Unit Total Cost <br />Description Dimensions Selection Quantity Unit Cost <br />cabin 20 X 12 X 10 Push demolished 88.00 CY $1.05 $92.66 <br /> materials/rubble/debris <br /> into pit - Max. 200 ft. <br /> push <br />portal door and 15 X 8 X 8 Push demolished 35.00 CY $0.37 $105.61 <br />vent house materials/rubble/debris <br /> into pit - Max. 50 ft. <br /> push <br />fencing 200 linear Fencing, wood, all 200.00 LF $1.84 $473.61 <br /> feet types - 4 ft. to 6 ft. <br /> high <br />powerline 100 ft Powerline or 100.00 LF $2.54 $727.61 <br /> telephone line, <br /> overhead, wood - <br /> Single pole <br />misc. debris 50 X 50 X 3 Load/haul/dump 280.00 CY $0.75 $936.21 <br /> demolished <br /> materials/debris into <br /> pit - Max. 1,000 ft. <br /> haul <br /> $ $ <br />Permit/job#: M1999042 <br />Abbreviation: None <br />Filename: M04?.-Oha <br />Subtotal (unadjusted): $936.21 Total Cost (adjusted for location): $870.68