My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-18_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2011-01-18_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:05 PM
Creation date
1/18/2011 3:17:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REPORT
Doc Date
1/18/2011
Doc Name
2010 Annual Reclamation Report
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNOWCAP COAL COMPANY, INC <br />2010 ANNUAL RECLAMATION REPORT <br />JANUARY 12, 2011 <br />(a) Permittee: Snowcap Coal Company, Inc. <br />P.O. Box 1430 <br />Palisade, CO 81526 <br />Permit No. C- 1981 -041 <br />(b) Area Disturbed - No new disturbance was created by Snowcap Coal Company, <br />Inc. during the year. The area of mine related disturbance which remains is as <br />follows: <br />Description Acres <br />Roadside South Portal - Ponds 8 & 9 0.9 <br />Roadside North Portal Topsoil pile area, ditch, pond & CBA #1 Sump 4.0 <br />North Decline Ponds, Sumps & Diversion Ditch 2.2 <br />Unit Train Load -out and Railroad Loop Track/Conveyor Corridor 28.0 <br />Unit Train Load -out Road to Loop Track 0.6 <br />Outfall 002 with Piping to River 0.2 <br />Cameo Refuse Disposal Area No. 1 & 2 Sediment Ponds 3.2 <br />Cameo Borrow Area No. 2 - Pond 11 Removal & Coal Gulch Realignment 2.6 <br />Total 41.7 <br />Areas Previously reclaimed are as follows (less acres w /Phase III release): <br />Description <br />Acres <br />Permanent Flood Control Dike (No. 2 Below) <br />2.8 <br />South Lease Exploration (No. 3 - 4 Below) <br />7.0 <br />North Decline (No. 5 - 6 Below) <br />17.7 <br />Northwest Intake (No. 7 Below) <br />0.1 <br />Cameo Refuse Disposal Area No. 1 (No. 8 Below) <br />10.3 <br />Cameo Refuse Disposal Area No. 2 (No. 9 Below) <br />7.5 <br />Cameo Borrow Area No. 1 (No. 10 Below) <br />2.5 <br />Cameo Refuse Disposal Area No. 1 (Misc) (No. 11 Below) <br />2.2 <br />South Fan (No. 12 Below) <br />0.9 <br />Cameo Refuse Disposal Area No. 1 (No. 18 Below) <br />14.8 <br />Roadside Refuse Borrow Area (No. 15 Below) <br />4.5 <br />Roadside Refuse Disposal Area including Upper Diversion (No. 16 Below) <br />7.1 <br />(Ph III release on 1.3 acres in 2010) <br />2 West Portals - partial (No. 13 Below) <br />0.3 <br />Cameo Refuse Disposal Area No. 2 (No. 19 Below) <br />20.2 <br />Cameo Borrow Area No. 2 (No. 20 Below) <br />2.7 <br />Roadside North Portal Mine Facilities, Stockpile Area and <br />24.6 <br />G Substation (No. 22 Below) <br />Roadside South Portal Upper Diversion Ditch (No. 17 Below) <br />1.1 <br />No. 2 West Portals (No. 24 Below) <br />0.7 <br />Substation B (No. 23 Below) <br />0.3 <br />North Decline Mine Dewatering System (No. 14 Below) <br />0.5 <br />Cameo Refuse Disposal Area No. 2 Topsoil Piles (No. 25 Below) <br />2.9 <br />Conveyor Corridor from Xcel Culvert north to Haul Road #3 (No. 26 Below) <br />2.2 <br />(Ph III release on 0.5 acres in 2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.