Laserfiche WebLink
CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Sunday, Dec/0512010 Arrive Time: 12:00 PM <br />Depart Time: <br />Project Name: West Elk Mine RPE Weather: Clear <br />Project Number: M10004MT Temp: <br />Client: Mountain Coal Company Client Representative: <br />General Contractor: High Country Equipment Supervisor: <br />Specialty Contractor: Specialty Superintendent or Foreman: Chuck Sickles <br />Source of Fill Material: Plans and Specs: N/A <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozer, loader, excavators, haul truck, sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: <br />Concerns for Next Visit: Retests Needed: <br />Other personnel contacted on-site: name/firm <br />Notes: <br />/ performed nuclear field density tests as requested by Chuck Sickles of material being placed at the refuse pile <br />expansion and also the lower refuse pile. Chuck Sickles showed the technician the area that was prepared and ready <br />for testing. Lambert and Associates' technician chose the test locations within the area that was ready for testing. <br />Please refer to the these results sheets for approximate test locations and test results. The test results indicate only <br />the relative compaction and soil moisture content of the material tested at the elevation and location tested at the time <br />of our site visit. Moisture content samples were obtained. <br />Lambert and Associates Technician: Hayes