Laserfiche WebLink
4I& mtb jNjarweo <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Tuesday/Oct/12110 Arrive Time: 10:15 AM <br />Depart Time: <br />Project Name: West Elk Mine RPE Weather: Overcast <br />Project Number: M10004MT Temp: <br />Client: Mountain Coal Company Client Representative: Andy Pavilistic <br />General Contractor: Mountain Coal Company Supervisor: Andy Pavilistic <br />Specialty Contractor: Specialty Superintendent or Foreman: Andy Pavilistic <br />Source of Fill Material: Plans and Specs: N/A <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozer, loader, excavators, sheepsfoot and vibratory smooth drum compactors <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: <br />Concerns for Next Visit: Retests Needed: <br />Other personnel contacted on-site: name/firm <br />Notes: <br />1 performed nuclear field density tests as requested by Andy Pavilistic of material being placed at the refuse pile <br />expansion. Andy showed the technician the area that was prepared and ready for testing. Lambert and Associates' <br />technician chose the test locations within the area that was ready for testing. Please refer to the these results sheets <br />for approximate test locations and test results. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of our site visit. Moisture content samples <br />were obtained. <br />11-ambert and Associates Technician: Hayes