Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />he Anan, intartad HOWever, if there as topsoil it Will 130 RRIV ged GonSiStAnt With <br />the submitted Plan of Oaeration. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drill halus will be abariduned in accurdarice with Rule ., assurniny that Flu ground walur <br />the holes will be abandoned per Rule 5.4. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No adits, shafts, punds will be nuated by this pioject. <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Roads will be reclaimed, by scarifying, fertilizing, seeding and the installation of water bars <br />as described in the Plan of Operation or a seed mix approved by the U.S. Forest Service.