Laserfiche WebLink
Trapper, SL-11- Phase 1 Bond Release 111912010 <br />Trapper Mining Co Christy Hulsman <br />Permit Numbers DRMS: C-1981-010 <br />OSM: C-010-81 <br />Trapper Mining Company <br />SL-12 Phase II Bond Release <br />Tuesday, November 9, 2010 9:00-9:45 <br />Weather: Snow, snowing, windy, upper 20's <br />Attendees <br />Rob Zuber, DRMS <br />Dan Hernandez, DRMS <br />Graham Roberts, Trapper Mine <br />Christy Hulsman, OSM <br />The SL-12 Phase II Bond Release inspection was scheduled to begin on Tuesday, November 9, 2010. <br />Snow moved into the area overnight and accumulated between one and three inches by the morning of <br />the inspection. Since snow accumulations were variable, the inspection was attempted. Upon arriving at <br />the reclamation areas on parcels F-AB-05 and F-AB-06, some of the areas included in the SL-12 <br />application, it was decided that too much snow had accumulated on the ground to accurately inspect <br />erosional and ground stability. Vegetative sampling had been conducted earlier in the year and those <br />reports are on file with DRMS. <br />It was decided that another inspection attempt would be coordinated on November 22, 2010. On that <br />date, the mine site had received several inches of snow, thus preventing that inspection. The SL-12 Bond <br />Release Inspection will now be held in Spring 2011.