Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR. <br />OFFICE OF SURFACE MINING <br />Dine Site Evaluation <br />State Program <br />1. Person/Permittee 9. Permit Number 10. Permit Type <br /> ITRAPPER MINING, INC. C-010-81 pp <br />2. Address 1 l . Field Visit Date 12. Purpose 13. SRA Present <br /> PO BOX 187 11/09/2010 0132 Y <br /> mm -dd - yyyy <br />3. City 4, State 14. <br />Permit <br />Status 15. Site Status 16. Facility Type <br /> <br />ICRAIG CO A <br />ADG <br />? <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. CCID # 19. Land Code <br />F81626 140 SF <br />(970) 826 - 6100 <br />7. Operator Name (if different than Permittee) 20. M.S.H.A. ID # 21.State Code 22. County Name <br /> 05-02838 CO MOFFAT <br /> 8. Mine Name 23. AVS Permittee Enity ID Number 24. State Office <br />I TRAPPER MINE 090118 <br />25. Hours 26. 5'i ature Block 27. Reviewing Official: <br />3.00 a. Permit Review 6 + PU7[+C5Y1 t &Q 79 <br /> <br />1.00 b. Site Visit Time Si t ature ature <br /> Christy, Hulsman <br /> <br />8.00 c. Travel Time Printed Name Review Date: <br /> <br />1.0 d. Report Writing 12/08/2010 <br />Date: <br />1 <br /> <br />Is Supplemental MSE P mm age - dd - yyyy <br />Used Y?N <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes - Item 12 CCR... Citizen Compliant Referral (non site <br />Oxx... Oversight RFx... Reclamation Fees CC::... Citizen Complaint (initial site visit) <br />Axx... Assistance Fxx... Federal Actions CCF... Citizen Complaiont Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />permitted but not yet disturbed. AB 1.. Bond Forfeiture: Bond forfeiture officially in process or completed, and <br />IN... Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2.. Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to <br />Coal mining completed and reclamation activities initiated reclaim site, but site not reclaimed to Program standards. <br />BR.. Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase I I I Release.) NA.... Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 <br />NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC.. Mining Complete: No mining activity on site, site FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 8161 tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1... Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that is <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. permitted but there is no bond. <br />facility such as tipple or preparation plant. P2... Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />NM.. No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and the <br />not in Temporary Cessation, no surface coal P3... Phase III Release: Reclamation completed and activity is not covered by the required <br />mining activity, and site not regraded. the RA has released all bond. permits from the RA. <br />Facility Type Codes - Item 16 D... Ancillary (Haulroad, Conveyor, and/or Rails) H... Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 213 <br />C... Preparation Plant G... Stockpiles K.. Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) <br />and wish to comment on the enforcement or compliance activities of OSM, tail 1-888-REG-FAIR (1-888-734-3247). <br />Page I of <br />Rev sca October +, aum