Laserfiche WebLink
Trapper, SL-11 - Phase I Bond Release <br />Trapper Mining Co. <br />Permit Numbers DBMS: C-1981-010 <br />OSM: C-010-81 <br />Trapper Mining Company <br />SL-11 Phase I Bond Release, Re-inspection <br />Monday, November 8, 2010 1:30-4:00 <br />Weather: Windy, overcast, 50's <br />Attendees <br />Rob Zuber, DRMS <br />Dan Hernandez, DRMS <br />Graham Roberts, Trapper Mine <br />Christy Hulsman, OSM <br />11/8/2010 <br />Christy Hulsman <br />A re-inspection of a portion of the SL-11 bond release area at the Trapper Mine was conducted on <br />November 8, 2010. The area was re-inspected due to the need for major rill and gully repairs in the F- <br />AB-08 section after the April 20, 2010 Bond Release inspection. The scope of the repairs was large <br />enough to delay bond release. The repaired areas had been completed one month prior to inspection. <br />The re-graded areas were hand-seeded and mulched with dead brush mixed in to decrease erosion. <br />The repairs appear effective and appear to be stable enough to prevent future rills and gullies from <br />forming in the same locations. <br />The section of the contour ditch blow-out has been successfully repaired. The ditch is now large enough <br />and stable enough to handle the runoff from the surrounding drainage area.