My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-13_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-01-13_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:06 PM
Creation date
1/13/2011 10:16:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
1/13/2011
Doc Name
Notices
From
DRMS
To
Various
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R?21NC0RF-,jkATED oRGE ML ROB[NSON.P.G. <br />ENVIRONMENTAL AND ENGINEERING SERVICES ER1CH RAt1BER,P.E <br />STRATEGICALLY POSITIONED-TECHNICALLY PREPARED ANDREW HARLEY,PH,D <br />GINNY KING <br />MAY DAY AND IDAHO MINE COMPLEX <br />WILDCAT MILTING CORPORATION <br />ORIGINAL 112(D) PERMIT <br />EXHIBIT A <br />Legal Description <br />Rule 6.4.1 <br />6.4.1(1) Affected Lands <br />The May Day Idaho Mine Complex permit boundary is comprised of 274.7 acres of which 47.6 <br />acres are affected directly or indirectly by future mining and exploration activities. The <br />township and range of the permit boundary is Section 28, T36N, Rl I W, N.M.P.M. <br />The main entrance to the May Day Idaho Mine Complex Universal Transverse Mercator (UTM) <br />Grid as determined by the United State Geological Survey (USGS) is 575797 413661. <br />The May Day Idaho Mine Complex includes the following affected lands: <br />May Day No. 1, May Day No.2, May Day No. 3 (Lamb), Idaho Millsite, Payday Millsite, the <br />Chief Tunnel including the access road and drainage channel), La Plata bridge, exploration <br />roads existing (access) including easement roads and designated buffer zones within the <br />identified permit boundary (Exhibit C-4). <br />Wildcat Mining Corporation has acquired the following legal descriptions for these affected <br />areas: <br />The May Day parcels owned by Fairview Land Company and leased to Wildcat Mining <br />Corporation (Exhibit N, Attachment N-2) include the following parcel legal descriptions: <br />May Day No. 1: a tract of land located in Section 28, T36N, Rl I W, N.M.P.M. and being <br />more particularly described as follows: beginning at a point from which the WIA comer <br />of said Section 28 bears S 70°58'59"'W a distance of 3268.40 feet, Thence, N 33°15'W a <br />distance of 300.0 feet, Thence N 56°45 E a distance of 500.0 feet, Thence S 33*15'E a <br />distance of 300.0 feet, Thence S..56°45'W a distance of 500.0 feet, to the point of <br />beginning and containing 3.5 acres. <br />5 <br />uv- 3. <br />May Day Idaho Mine Complex 112(d) Permit Application <br />September 21 .2010 (REVISED Oct. 22, 2010) <br />"Strategically Positioned - Technically Prepared" <br />5555 DTC Parkway Suite A-4000, Greenwood Village, Colorado 80111 <br />Phone: (303)832-7664, Fax: (303)832-7469
The URL can be used to link to this page
Your browser does not support the video tag.