Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Refuse Pile Project No.: 99-3983 Date: 10/29/10 <br />Time: 4.0 <br />Location: Foidel Creek Mine Report No.: 57 Mileage: 44 <br />Client: Twentymile Coal Co. Engr. /Tech: CR <br />Work Performed: <br />As requested, we visited the project site on today's date and conducted compaction test No.'s 447 through 451 on <br />the material being placed in the Refuse Pile Expansion. <br />Twentymile Coal Company crews placed and compacted processed Waste Coal in the Refuse Pile Expansion. <br />We also obtained a sample of material and returned it to our laboratory in Steamboat Springs, Colorado for <br />standard checkpoint Proctor testing. The sample matched a previous curve on Proctor No. 7P. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Twentymile Coal Co. was notified of today's test location.