Laserfiche WebLink
<br /> <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year Zoio <br />?nv? C'rz LsacQoc C- q?3 - s? I ermo? , L LC <br />mine name permit # Permittee <br />Address: y3 q `/ 0 &Li i - - 6Z 5q <br /> <br /> <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 3 + O / 3 <br />Acres backfilled and graded + (? = d <br />Acres to soiled p + = Q <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateaorv below. Do not include acres that hRvP achieved final PhacP III rzIPasa <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded* 0 + 0 = 0 = v + a <br />Include, IT necessary, a aescnptlon or any augmentea seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 13 and the total number of acres: <br />Phase I released 0 Phase II released 6 Phase III released 0 <br />For Mines in Permanent Cessation: 1 <br />Total acreage in facilities subject to reclamation but yet to be completed V <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z <br />Acreage in active mining areas 3, <br />'(exclude acres where Phase 111 release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />b <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded