Laserfiche WebLink
MARTIN AND WOOD WATER CONSULTANTS, INC. <br />641.1: GreerdCrotssent Pit <br />1111717010 - CRR <br />TABLE 2: GREENICROISSANT PIT OPERATIONAL LOSSES FOR YEAR 2011 <br />Hl 1131 I91 M Ir.% Ick% I&% rn IQ\ In% Mn\ 144% <br /> NET <br />EVAPORATION <br />FOR <br />2011 <br />ANNUAL <br />AGGREGATE <br />PRODUCTION <br />DUST <br />SUPPRESSION <br />WATER <br /> <br /> <br />ONCRETE I <br /> <br />CONCRETE <br />PRODUCTION TOTAL <br />EVAPORATION <br />AND <br />OPERATIONAL TOTAL <br />EVAPORATION <br />AND <br />OPERATIONAL. <br /> <br /> <br />AGGING <br />YEAR <br />2011 <br />LAGGED <br />MONTH able 1 PERCENT AMOUNT WATER LOSS PRODUCTION WATER LOSS WATER LOSSES WATER L 81B3 FACTORS DEPLETIONS <br /> 1ACRE-FEET) % NS (ACRE-FEET) (GALLONS) I PCCRE-FEM CU YD ACRE F GPM % ACRE Fls <br />JAN 2.14 2.0% 2000 0 M14 11428.0 1.05 25.20 6.6 6.34 <br />FEB 2.67 4 800 0 0.1 4 11428.0 1.05 4.00 29.77 5.7 5.47 <br />MAR 320 84% 8 400 6 038 11428 0 1.06 488 98 31 5 3 <br />APR 563 196% 19,600 66 038 14286 0 1.32 7.72 57.47 S7 5 47 <br />MAY 6.70 13.6% 13,600 U0.40 00 <br />230JODO 0.71 14 0 1.52 9.13 97JM 6.8 8.52 <br />JUN 9.92 13.6% 13.600 00 0.85 22,858.0 2.10 1 1328 88.87 8.3 7.96 <br />JUL 10.99 13.5% 13,600 67 1.08 58.0 2.10 14.57 108.40 10.2 9.78 <br />AUG 1818 8. 1.08 2 0 1.84 13.37 99.44 11.5 11.03 <br />SEP 6.97 8.6% 8,800 1.08 000.0 1.84 10.15 75 51 11.7 1122 <br />OCT 4.82 6.0% 6,000 0.18 230,000 0 71 20 0 1.84 755 5617 10.8 1036 <br />NOV 2.41 4.8% 4,800 0.14 122,687 038 17142.0 1.58 451 33 54 8 6 9.11 <br />DEC 1.88 2.0% 2,000 0.06 46000 0.14 14 0 1.32 3.40 2627 7.9 7.66 <br />TOTAL 67.61 100.0% 100.00 2.96 TAG 2D0,000 1841 96,82 69.07 10060 96.12 <br />NOTES: (1) FROM TABLE 1, COLUMN 7 <br />(2) BASED ON INFORMATION FROM OPERATOR <br />(3) BASED ON TOTAL ANNUAL PRODUCTION OF 100,000 TONS <br />(4) WATER LOSS = (PRODUCTION, COL 3) • 2000 LBSITON • (4%)1(62.4 LBSICU FTY435W CU PI7ACRE-FOOT) <br />(So and Sb) BASED ON INFORMATION FROM OPERATOR <br />(8) BASED ON ANNUAL PRODUCTION OF 20D,000 CU YOS <br />(7) BASED ON 30 GALLONS PER CU YD OF CONCRETE <br />(8) TOTAL LOSSES = (NET EVAP, COL 1) +(WATER LOSS, COL 4) + (DUST SUPP, COL 5b) + (CONCRETE PROD WATER LOSS, COL 7) <br />(9) (TOTAL LOSSES, COL 8) -325851 1 1440 1 30.4167 (sWape number of day per month) <br />(10) BASED ON A STREAM DEPLETION MODEL 1MTN D"=1500 FT, D TO BOUNDARY - 2100 FT, 8 0.20, T 50.000 GPOIFT <br />(11) TOTAL DEPLETION = (SUM OF TOTAL LOSSES, COL 8) • (LAGGING FACTORS, COL 9) <br />i <br />I <br />' i <br />i <br />i <br />i