Laserfiche WebLink
POND DISCHARGE <br />The following table presents monitoring results for the mine seepage discharge. <br />Water was diverted to the new treatment pond during the week of June 14 to June 21, <br />1999. On August 2, 1999 the new treatment pond was full and discharging. <br />Bear performed lab analysis on the flow from the spring (hillside) as well as the pond <br />outflow during the year. Following are the data. <br />January 2010 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3460 3210 <br />Total Suspended Solids mg/1) 5 9 <br />Iron (mg/1) 0.7 2.0 <br />Februar 2010 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 2910 3080 <br />Total Suspended Solids (mg/1) 5 U <br />Iron (mg/1) 0.83 2.9 <br />March 2009 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 2740 3190 <br />Total Suspended Solids (mg/1) 9 U <br />Iron (mg/1) 1.06 1.44 <br />April 2010 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3250 3270 <br />Total Suspended Solids (mg/1) 7 U <br />Iron (mg/1) 0.9 1.5 <br />May 2010 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3290 3260 <br />Total Suspended Solids (mg/1) U U <br />Iron (mg/1) 0.9 1.5 <br />June 2 010 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3580 3400 <br />Total Suspended Solids (mg/1) U U <br />Iron (mg/1) 0.6 1.4 <br /> <br />-5- <br />