Laserfiche WebLink
South Taylor Fill Inspection Certification <br />On December 3, 2010, 1 inspected the area in which the South Taylor Excess Spoil Fill is being <br />constructed. This report covers activities associated with the East Taylor Fill and the West Taylor <br />Fill identified on Map 23A of the approved permit. The purpose of this inspection was to observe <br />status of the fill placement. This inspection is necessary to satisfy the requirements of CDMG Rule <br />4.09.10 (1a) and Rule 4.09.1 (1 b). <br />A-A' Underdrain Area: The construction on the entire A-A' underdrain including fabric installation <br />has been completed. The uppermost portion of the drain remains uncovered while the central <br />portion has been covered with fill. The lowermost portion of the drain has been covered to within <br />100 feet of the inlet of the West Taylor pond. Fill placement continues. <br />B-B' Underdrain Area: Underdrain construction is completed and all portions of the drain have <br />been covered. Fill placement continues. As of the most recent topographic data (May, 2010), <br />substantial quantities of fill have been placed over the drain. <br />C-C' Underdrain Area: Underdrain construction is completed and all portions of the drain have <br />been covered. Fill placement continues. <br />In November, 2010, TR-87 was approved to extend toe of the temporary fill. Further, a pending <br />permit change designated as TR-81 will make these changes permanent with the modification of <br />the postmining topography. <br />Design requirements for the spoil pile are addressed in Volume 13, Exhibit 21, Item 1, Introductory <br />Letter. Inspection requirements during construction are further detailed in Volume 12, Section 4.09. <br />I am a Registered Professional Engineer in the State of Colorado and a representative of <br />Environmental Solutions, Inc, P. O. Box 2996, Cheyenne, Wyoming. Being familiar with the <br />Colowyo operation and the coal program permitting process in Colorado, the construction activities <br />related to the East Taylor Fill are in conformance, to the best of my knowledge and experience, as <br />specified in the Introductory pages and the associated report found in Volume 13, Exhibit 21, Item 1 <br />and other applicable requirements of the approved permit documents, a portion of CDMG Permit C- <br />81-019. _..1rtill/tU.._ <br />L / C0 <br />O••SC Afj'•% V <br />32257 z: <br />E. No. 32257 <br />!SAT !/ <br />xc: Mr. Kurtis Blunt, Colowyo Coal Company, L.P. <br />cf 17.15.1 <br />cf 24.20 (South Taylor Fill)