Laserfiche WebLink
S. MEASUREMENT AND RESPONSIBILITY FOR DISTRIBUTION <br />(a) The water to be released for the Contractor shall be measured by facilities of the United <br />States and delivered into the Gunnison River at the outlet works of Crystal Dam. The Contractor <br />shall suffer all distribution and administration losses from the point of such delivery to the place <br />of use. <br />(b) The Contractor shall hold the United States harmless on account of damage or claim of <br />damage of any nature whatsoever, including property damage, personal injury, or death arising out <br />of or connected with the control, carriage, handling, use, disposal, or distribution of such water by <br />the Contractor. <br />(c) This contract and all water taken pursuant hereto shall be subject to and controlled by <br />the Colorado River Compact, dated November 24, 1922, and proclaimed by the President of the <br />United States June 25, 1929, the Boulder Canyon Project Act approved December 21, 1928, the <br />Boulder Canyon Project Adjustment Act of July 19,1940, the Upper Colorado River Basin <br />Compact dated October 11, 1948, the Mexican Water Treaty of February 3, 1944, and the , <br />Colorado River Basin Project Act of September 30, 1968, Public Law 90-537. <br />(d) In the event water available to the Contractor is required to be curtailed under an by <br />reason of the provisions of the foregoing acts, including the reaching of maximum use of war <br />allotted to the State of Colorado, no liability shall attach to the United States for such cUrtailment, <br />and the Contractor agrees to reduction of the amount of water taken hereunder as the Secretary <br />determines necessary to comply with the provisions of said acts. <br />6. STANDARD CONTRACT ARTICLES <br />The standard contract articles applicable to this contract are listed below. The full text of these <br />standard articles is attached hereto as Addendum "A" and by this reference made a part theeo£ <br />A. GENERAL OBLIGATION-BENEFITS CONDITIONED UPON PAYMENT <br />B. NOTICES <br />C_ CONTINGENT UPON APPROPRIATION OR ALLOTMENT OF FUNDS <br />D. OFFICIALS NOT TO BENEFIT <br />E. ASSIGNMENTS LIMITED-SUCCESSORS AND ASSIGNS OBLIGATION <br />F. BOOKS, RECORDS, AND REPORTS <br />G. RULES, REGULATIONS, AND DETERMINATIONS <br />H. PROTECTION OF WATER AND AIR QUALITY <br />1. EQUAL EMPLOYMENT OPPORTUNITY <br />J. COMPLIANCE WITH CIVIL RIGHTS LAWS ARID REGULATIONS <br />K. MEDIUM FOR TRANSMITTING PAYMENTS <br />L.CONTRACT DR AFT11SIC CONSIDERATIONS <br />M_ CONSTRAINTS O1NT AVAILABI TTY OF WATER <br />4