My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-04_HYDROLOGY - M1984108
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1984108
>
2011-01-04_HYDROLOGY - M1984108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:36 PM
Creation date
1/10/2011 8:54:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
HYDROLOGY
Doc Date
1/4/2011
Doc Name
Proof of ownership for the 26.4 shares of Uncompahgre Valley Water users Association water
From
Western Gravel, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. MEASUREMENT AND RESPONSIBILITY FOR DISTRIBUTION <br />(a) The water to be released for the Contractor shall be measured by facilities of the United <br />States and delivered into the Gunnison River at the outlet works of Crystal Dam. The Contractor <br />shall suffer all distribution and administration losses from the point of such delivery to the place <br />of use. <br />(b) The Contractor shall hold the United States harmless on account of damage or claim of <br />damage of any nature whatsoever, including property damage, personal injury, or death arising out <br />of or connected with the control, carriage, handling, use, disposal, or distribution of such water by <br />the Contractor. <br />(c) This contract and all water taken pursuant hereto shall be subject to and controlled by <br />the Colorado River Compact, dated November 24, 1922, and proclaimed by the President of the <br />United States June 25, 1929, the Boulder Canyon Project Act approved December 21, 1928, the <br />Boulder Canyon Project Adjustment Act of July 19,1940, the Upper Colorado River Basin <br />Compact dated October 11, 1948, the Mexican Water Treaty of February 3, 1944, and the , <br />Colorado River Basin Project Act of September 30, 1968, Public Law 90-537. <br />(d) In the event water available to the Contractor is required to be curtailed under an by <br />reason of the provisions of the foregoing acts, including the reaching of maximum use of war <br />allotted to the State of Colorado, no liability shall attach to the United States for such cUrtailment, <br />and the Contractor agrees to reduction of the amount of water taken hereunder as the Secretary <br />determines necessary to comply with the provisions of said acts. <br />6. STANDARD CONTRACT ARTICLES <br />The standard contract articles applicable to this contract are listed below. The full text of these <br />standard articles is attached hereto as Addendum "A" and by this reference made a part theeo£ <br />A. GENERAL OBLIGATION-BENEFITS CONDITIONED UPON PAYMENT <br />B. NOTICES <br />C_ CONTINGENT UPON APPROPRIATION OR ALLOTMENT OF FUNDS <br />D. OFFICIALS NOT TO BENEFIT <br />E. ASSIGNMENTS LIMITED-SUCCESSORS AND ASSIGNS OBLIGATION <br />F. BOOKS, RECORDS, AND REPORTS <br />G. RULES, REGULATIONS, AND DETERMINATIONS <br />H. PROTECTION OF WATER AND AIR QUALITY <br />1. EQUAL EMPLOYMENT OPPORTUNITY <br />J. COMPLIANCE WITH CIVIL RIGHTS LAWS ARID REGULATIONS <br />K. MEDIUM FOR TRANSMITTING PAYMENTS <br />L.CONTRACT DR AFT11SIC CONSIDERATIONS <br />M_ CONSTRAINTS O1NT AVAILABI TTY OF WATER <br />4
The URL can be used to link to this page
Your browser does not support the video tag.