My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (111)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (111)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:27 PM
Creation date
1/7/2011 2:23:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 8.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />V) VLF Primary Underdrain <br />No work was performed during the week. <br />VI)VLF Geosynthetics <br />No work was performed on site during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed and documented ambient and fill temperatures, as well as the placement of structural fill <br />within the Phase 5 VLF fill area. <br />AMEC observed stripping topsoil at the East Cresson Clay Borrow. <br />AMEC observed, obtained samples, and assisted in the process of Soil Liner Fill material at the East <br />Cresson Clay Borrow. <br />AMEC observed, obtained samples, and assisted in the process of LVSCF at Pad 4. <br />AMEC observed the remediation of UG#3012 constantly. <br />AMEC observed confirmatory drilling at UG#3012 constantly. <br />AMEC observed confirmatory drill hole grouting at UG#3012. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, and Moisture-Density <br />Compaction testing) for sampled materials. <br />VLF Weekly Report WE 03.06.10.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.