My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (111)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (111)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:27 PM
Creation date
1/7/2011 2:23:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 8.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANFIN& <br />amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: March 6, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 2/28/10 through 3/6/10 <br />Days S M T W T F S <br />Work Shifts - D D D D D D <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 16°F to 27°F (+/-) High: 34°F to 50°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No issues. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D-6 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem-axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A14+00 (+/-) and <br />A27+00 (+/-), approximately 10 to 150 feet left of centerline; between stations A54+00 (+/-) <br />and A58+00 (+/-), approximately 0 to 60 feet right of centerline; between stations F0+00 (+/-) <br />and F 12+00 (+/-), approximately 10 to 75 feet left of centerline; between stations G0+00 (+/-) <br />and G4+00 (+/-), approximately 10 to 75 feet right of centerline; and between stations H5+00 <br />(+/-) and 1-110+00 (+/-), approximately 200 feet left of centerline to 80 feet right of centerline; <br />between stations H20+00 (+/-) and H30+00 (+/-), approximately 250 feet left of centerline to <br />50 feet right of centerline; and between stations J13+00 (+/-) and J 18+00 (+/-), approximately <br />VLF Weekly Report WE 03.06.10.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.