amec <br />Earth & Environmental <br />D) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28+00 (+/-) to A36+00 <br />E) Cut to Fill <br />1) VLF <br />A CAT 385 excavator, a CAT 375 excavator, and a John Deere 850 excavator were used to <br />excavate structural fill material from the following areas: between stations H2+00 (+/-) and <br />H11+00 (+/-), approximately 200 feet left of centerline to 10 feet right of centerline; between <br />stations 1416+00 (+/-) and H28+00 (+/-), approximately 75 feet left of centerline to 50 feet <br />right of centerline; and between stations J15+00 (+/-) and J24+00 (+/-), approximately 50 feet <br />left of centerline to 50 feet right of centerline. The structural fill material was loaded into CAT <br />777 haul trucks and hauled to fill areas. <br />Prior to structural fill placement existing fill areas were ripped and frost was allowed to thaw <br />or was removed. Existing fill temperature were monitored and found to be above 32°F before <br />fill placement. An AMEC representative monitored ambient temperatures on an hourly basis <br />during fill placement. Fill temperatures were monitored during ambient temperatures below <br />32°F and averaged 33°F to 46°F. <br />Structural fill was placed in the following areas: between stations A53+50 (+/-) and A60+00 <br />(+/-), approximately 0 to 100 feet right of centerline: between stations B0+00 (+/- and B 10+00 <br />(+/-) , approximately 20 feet left of centerline to 20 feet right of centerline; and between <br />stations J15+00 (+/-) and J28+00 (+/-), approximately 75 feet left of centerline to 150 feet right <br />of centerline Structural fill was placed in 18" to 24" lifts using various CAT dozers. Each lift <br />was moisture conditioned using a CAT 773 water truck (when necessary) and compacted using <br />a 10-ton vibratory smooth drum compactor, passing over the entire fill surface at least 4 times <br />(method compaction technique is applicable). Ambient and fill temperatures were monitored <br />and recorded during fill placement. <br />Blast pattern drilling was performed between stations H1+00 (+/-) and H4+500 (+/-), <br />approximately 80 to 100 feet right of centerline and between stations J24+00 (+/-) and J26+00 <br />(+/-), approximately 50 to 100 feet right of centerline. Blasting was performed on Monday <br />(2/22/2010), Tuesday (2/23/2010), Wednesday (2/24/2010), Thursday (2/25/2010), Friday <br />(2/25/2010), and Saturday (2/26/2010). <br />F) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of Soil Liner Fill material continued this week. A CAT D-8 dozer, a CAT 320 <br />excavator, a CAT 966 front-end loader, and tandem-axel haul trucks were used to excavate, haul, <br />and process the material. <br />VLF Weekly Report WE 02.27.10.D.doc