ame <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: February 13, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 2/7/10 through 2/13/10 <br />Days S M T W T F S <br />Work Shifts D D D D D - <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 10°F to 17°F (+/-) High: 26°F to 34°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No issues <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Clearing and grubbing was finished at the East Cresson Clay Borrow using a CAT 330 <br />excavator, a CAT D-6 dozer and, two 40-ton haul trucks. Trees/slash was stockpiled in a <br />designated area within the clay borrow area. <br />B) Stripping <br />1) VLF <br />Topsoil stripping was performed during the haulage of clay material to the plant using one <br />CAT D-6 dozer and one CAT D-8 dozer at the East Cresson Clay Borrow. Haulage of topsoil <br />to the East Cresson Clay Borrow topsoil stockpile continued. <br />Future topsoil stripping will be performed as the borrow excavation progresses. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 02.13.10.D.doc