Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Bill Ritter, Jr. <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director/State Engineer <br />Response to Reclamation Permit Application Consideration <br />DATE: January 3, 2010 <br />TO: Michael A. Cunningham, Environmental Protection Specialist <br />CC: Division 1 Office, District 6 Water Commissioner <br />FROM: loana Comaniciu, P.E.' <br />RE: Goose Haven Reservoir #2-Complex Expansion, File No. M-2010-071 JAN 06 20 1 I <br />Operator: Mr. Bradley Dallam, City of Lafayette, (303)-665-5588 Division 01 r%ac4aria of <br />Contact: Mr. Aaron Asquith, McLaughlin Water Engineers, Ltd., (303)-964-3333 Mining and SafetY <br />Sec 15 and 22, Twp. 1 North, Rng. 69 West, 6th P.M., Boulder County <br />CONDITIONS FOR APPROVAL <br />? The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will still consume ground water by: ® evaporation, ® dust control, <br />reclamation, ® water removed in the mined product, ® processing, ® other: dewatering. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. Our records show that a well permit application and <br />associated temporary substitute water supply plan have not been submitted to the State Engineer's <br />Office. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />? The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from . Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />? The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the water was diverted in priority under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WQCD. Otherwise, the operator will need to make replacements for evaporation. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.wa ter.state. co.us