My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-05_REVISION - M2005003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005003
>
2011-01-05_REVISION - M2005003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:29 PM
Creation date
1/6/2011 2:09:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005003
IBM Index Class Name
REVISION
Doc Date
1/5/2011
Doc Name
Submittal
From
Van Valkenburg Gravel
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h <br />Vanvalkenburg Gravel Pit <br />Exhibit E <br />Reclamation Flan <br />Reclamation ofthe permit area will rerun the site to a past mining land we of wildlife habitat and <br />rangeland. <br />At a minimum, the top 12" of topsoil will be stripped and stockpiled around the perimeter of the pit area. <br />Gtass, shrubs, and small trees will be incorporated into the topsoil piles. Stdyiaent topsoil will be <br />maudmed to caaer all past and firWre mining areas m. the permit area to a depth of V. Topsoil piles will <br />be revegetatod with a mixture of native grasses to maintain topsoil viability and to prevent topsoil erosion. <br />Reclamation work will be sequenced to follow along with mining. The majority of reclamation will <br />commence inunodiately upon final extraction of the mineral materials or prior to permit expiration. <br />Reclamation will begin by reshaping and recontouting the staging area and pit area to conform with the <br />adjacent topography and natural landfonms. This work will be completed by the Landowner The work <br />will be done with a dozer and a scraper. Recontouted slopes will not exceed 3:1. <br />After re contouring. tbp substratum will be scarified with a ripper. Topsoil from the a4ioining plies will be <br />r esptead over all disturbed areas to a depth of at least 6" in preparation of a uniform seed bed The site will <br />be seeded bythe County with a:moctute4tna6vc: t:?t <br />iwe°of?dia <br />eed shat either dril se eel :shall be broadcast seeded into fzesh dour cleat marks. ubroadcast, the <br />seed will be scratched into the soil. Seeding will occur alter October TO and prior to soil freeze-up or any <br />accumulations of snow. <br />The Landowner will monitor the site on a monthly basis to determine revegetation success and to evaluate <br />the site stability. The landowner will take any steps neoessary to control soil erosion and repair damaged <br />lands. If aim om season the seeding looks as thought it will be a Wure,Tbe landowncrwill reseed the site <br />psorrd? of the site in accordance with this plan. After final reclamation approval by the landowner and <br />the
The URL can be used to link to this page
Your browser does not support the video tag.