My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-04_REVISION - M1983139
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983139
>
2011-01-04_REVISION - M1983139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:23 AM
Creation date
1/6/2011 2:09:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983139
IBM Index Class Name
REVISION
Doc Date
1/4/2011
Doc Name
Notice of FW Increase
From
DRMS
To
Pioneer Sand Company, Inc.
Type & Sequence
SI1
Email Name
DB2
MR1
AHH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />: :::::.::::.::::.:::::: .:::::.:::::::::::::::::::.::::::::::::::::::::::::::::::::::::::::::::::::::::: <br />_ ..:.................................................. ..... ........................................................................ <br />PROJECT IDENTIFICATION Agency or organization name : DRMS <br />Task #: DEM <br />State : Colorado Permitijob# : M-1983-139 <br />Date : 30-Dec-2010 County : Jefferson Abbreviation : none <br />User: DB2 Site : Leyden Pit Filename : M139-DEM <br />Permitting action : SI-1 from Feb 2010 inspection <br />Task description : Demolition and Disposal <br />_ _ ...::..:......:....:............................... ... .... <br />................................................................................................ .. ....... .... . . . ..... . ...... .. .. . o.;: <br />UNIT COSTS Last unit cost update : March 2009 Location adjustment : 96.83% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-Small fixed buildings 1-story Demo.ldisp?appr dump - to 5 mi. 1,000.00 CF $1.0694 $1,069.36 <br />-Conveyors - fixed 200 LF Conveyor, overland - 5'W x 6'H 200.00 LF $16,5329 $3,306.58 <br />-Crushers and Screens 1-story Demo.ldisp.lappr dump - to 5 mi. 2,560.00 CF $1.0694 $2,737.55 <br />-Fuel tank - remove contents 15,000 gal Haz. waste - Bulk liq., > 2.5K g. 1,500.00 GAL $1.8194 $2,729.10 <br />-Fuel tank - sludge disposal 15,000 gal ON-site sludge disposal - Avg. 1,500.00 GAL $6.6000 $9,900.00 <br />-Fuel tank - purge and clean for transport 15, 000 gal Insert dry ice - 1.5 lbs.1100 gal. 225.00 LB $2.2000 $495.00 <br />-Fuel tank - haul to certified dump 15,000 gal Haul to cert. dump - 9K-12K gal. 1.00 EA $1,160.0000 $1,160.00 <br />-Trailers - towing off site 50-ft trailers x 5 Haullmi., 12-18 CY T- 30 mph avg. 100.00 MI $1.0990 $109.90 <br />-Trailers - towing off site small trailers x 14 HauUmi., 12-18 CY T- 30 mph avg. 280.00 MI $1,0990 $307.72 <br />-Refuse removal 50 truckloads Means Crew A-3G 12.00 Daily $1,693.0000 $20,316.00 <br />-Refuse disposal 50 truckloads Dump fees - Rubbish only 900.00 CY $78.0000 $70,200.00 <br />-Scale - demolish for removal 75'x 20' Floor, concr., avg. reinf. - 12" th. 1,500.00 SF $3.3330 $4,999.54 <br />-Truck driver for towing large trailers 5 trailers Means heavy truck driver @ $33.151hr 20.00 hourly $33.1500 $663.00 <br />-Truck driver for towing small trailer,; 14 trailers Means light truck driver @32.25rhr 64.00 hourly $32.2500 $2,064.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $120,058 Total Cost (adjusted for location): $116,252
The URL can be used to link to this page
Your browser does not support the video tag.